PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 1st floor detention cells Facing North.jpg Laying out block at the 1st floor Rooms along South Elevation.jpg Laying out block at the detention cells Facing West.jpg 1st floor sprinkler heads Facing North.jpg 2nd floor interior metal framing Facing North.jpg Installed door frame at the 1st floor sprinkler room Facing East.jpg Installed temporary pipe valve at the 4th floor Facing West.jpg Installing pipe hangers at the 1st floor Facing West.jpg
Previous pageNext page 1st floor sprinkler heads Facing North
1st floor sprinkler heads Facing North